UC Riverside

Riverside, CA

Project Objective:  To comply with SCAQMD Rule 1146 for Two (2) Fire Tube Boilers

Key Players:

  • TTG of San Diego, CA was the Architect responsible for the project
  • Jackson & Blanc of San Diego, CA was the Prime Contractor and responsible for overseeing the project
  • R.F. MacDonald of Santa Fe Springs, CA was the Sub Contractor and responsible for installation of the Boilers & SCR systems
  • C&C Panasia of Concord, CA designed, manufactured & commissioned, in conjunction with R.F. MacDonald, the SCR systems

Click on an image below for a larger view: