Diamond Pet Foods 

Ripon, CA

Project Objective:  To comply with SJVUAPCD Rule 4320 for Two (2) 350hp Firetube Boilers

Key Players:

  • R.F. MacDonald of Modesto, CA was the Prime Contractor and responsible for installation of the entire system
  • C&C Panasia of Concord, CA designed, manufactured & commissioned, in conjunction with R.F. MacDonald, the SCR system, including AFCU

 

Click on an image below for a larger view: